"Debate Grows Over Farmers' Share in India's Solar Expansion"
PM-KUSUM
scheme to solarise farm power supply, including farmer-owned grid-connected solar plants under Component A.
Agri-photovoltaics (agri-PV)
solar panels raised above farmland to allow simultaneous cultivation and power generation.
India's solar capacity has grown from 2.82 GW in 2014 to 168.04 GW by August 2026. This makes India the world's third-largest solar power producer, after China and the United States. Most of this growth, about 74 per cent, comes from utility-scale solar parks built on wasteland or degraded land. Rooftop solar makes up close to 20 per cent of the total, driven largely by PM Surya Ghar: Muft Bijli Yojana. This scheme targets rooftop installation on 1 crore households. It offers a central subsidy of up to Rs 78,000 for a 3-kW system, and some states add further support on top of this. The scheme also carries a skilling component, aiming to train a large pool of installation and maintenance workers.
Farmers, however, remain largely outside this solar expansion. The PM-KUSUM scheme (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan) was meant to change this. Its Component A lets farmers set up solar power plants of up to 2 MW on their own land and sell power to the grid. Unlike PM Surya Ghar, Component A carries no capital subsidy, which has limited its uptake. Agriculture itself falls under Entry 14 of the State List in the Seventh Schedule, so state governments, not the Centre, control most decisions on land use, power procurement and tariffs for any farm-based solar project. This is why models like Gujarat's Khavda Solar Park, spread over the Rann of Kutch with a planned capacity of 30 GW and now the country's largest solar park, have relied on strong state-level land and infrastructure support.
Agri-photovoltaics, or agri-PV, mounts solar panels well above the ground, roughly 11 feet high, with enough spacing between rows for machinery and sunlight to reach crops below. This lets the same plot generate both food and electricity, instead of choosing one over the other. This distinction matters because ground-mounted solar parks, the dominant utility-scale model, occupy large tracts of land and cannot be placed on farmland without displacing cultivation.
PM-KUSUM is built around three components: pump solarisation to replace diesel irrigation pumps, small grid-connected solar plants, and Component A, the segment relevant here, which allows farmer-owned generation for sale to the grid. …
With reference to 'PM Surya Ghar Muft Bijli Yojana', consider the following statements:
I.Its target is to install solar panels on the roofs of one crore households in the residential sector.
II.Ministry of New and Renewable Energy's aim is to provide grassroot-level training on installation, promotion, maintenance and repair of rooftop solar panels.
III.Its target, under the capacity building scheme component, is to create more than three lakh skilled manpower by imparting new skills and upgrading skills.
Which of the statements given above are correct?
Consider the following statements:
1.Gujarat has the largest solar park in India.
2.Kerala has a fully solar powered International Airport.
3.Goa has the largest floating solar photovoltaic project in India.
Which of the statements given above is/are correct?
With reference to 'PM Surya Ghar: Muft Bijli Yojana', consider the following statements: 1. The scheme aims to provide rooftop solar to one crore households. 2. A household installing a 3-kW rooftop system is eligible for a central subsidy of up to Rs 78,000. Which of the statements given above is/are correct?
Agriculture, as a subject, falls under which of the following in the Indian Constitution?
Consider the following statements about the PM-KUSUM scheme: 1. Component A permits farmers to set up solar power plants of up to 2 MW capacity on their own land. 2. Component A currently offers farmers a capital subsidy on par with PM Surya Ghar: Muft Bijli Yojana. Which of the statements given above is/are correct?
Match List-I (Solar initiative/site) with List-II (associated feature) and select the correct answer using the codes given below: List-I:
A.PM Surya Ghar: Muft Bijli Yojana
B.PM-KUSUM Component A
C.Khavda Solar Park
D.Operation Flood; List-II:
1.Farmer-owned grid-connected solar plants on agricultural land
2.World Bank-backed rooftop solar subsidy for households
3.Largest solar park in India, located in Gujarat
4.World Bank-financed dairy cooperative movement
According to a recent CAG report cited in current policy discussions, the approximate gap between the average cost of supplying electricity to agriculture and the tariff actually realised from agricultural consumers is closest to which of the following?