EconomyGS3+ GS2

PM GatiShakti Completes Five Years of Infrastructure Planning

PIB·2026-10-13

"PM GatiShakti Completes Five Years of Infrastructure Planning"

Prelims Facts

  • •The PM GatiShakti National Master Plan was launched on 13 October 2021.
  • •It is built around seven Infrastructure Engines: roads, railways, ports, waterways, airports, mass transport and logistics infrastructure.
+4 more facts — sign up free to unlock

Key Terms

GIS (Geographic Information System)

a system that stores and displays location-based data in map layers

Infrastructure Engine

one of seven core sectors, like roads or railways, coordinated under GatiShakti

+4 more terms — sign up free to unlock

Study Note

BackgroundCore Concept

Background

India's infrastructure has long suffered from siloed planning. Roads, railways, ports and utilities were often planned by separate ministries without coordination. This led to delays, cost overruns and duplicated work. For example, a newly built road was dug up again for a pipeline. To fix this, the PM GatiShakti National Master Plan was launched on 13 October 2021. It is a GIS-based (Geographic Information System) digital platform. It brings infrastructure data from different ministries, states and union territories onto one map. A GIS is a system that stores and displays location-based data in layers. This lets planners see roads, forests, railway lines and economic zones together on a single screen.

Seven Infrastructure Engines of PM GatiShakti
PM GatiShakti
Seven Infrastructure Engines
Roads
Railways
Ports
Waterways
Airports
Mass transport
Logistics infrastructure

The plan rests on six guiding principles: integrated development, use of multiple transport modes together, last-mile connectivity, faster land acquisition, fewer clearances, and lower ecological impact. It organises planning around seven Infrastructure Engines: roads, railways, ports, waterways, airports, mass transport and logistics infrastructure. These form the core sectors the plan coordinates. This builds on India's long-standing recognition. Going back to early Five-Year Plans, India recognised that infrastructure is a precondition for growth in every other sector of the economy. Infrastructure is not an end in itself.

The platform's institutional design also connects to a wider digital-governance question. How should government combine data from many sources, government and increasingly private, for better decision-making? A related and distinct initiative links PM GatiShakti's portal with private transaction-data analytics. This adds real-time economic signals. It shows the direction this planning model is heading: from static maps to dynamic, data-driven decisions.

The Topic Explained

PM GatiShakti works through a three-tier institutional framework. The Empowered Group of Secretaries (EGoS) is chaired by the Cabinet Secretary. It oversees implementation and approves changes to the Master Plan. Below it, the Network Planning Group (NPG) brings together heads of network planning divisions from infrastructure ministries. It examines project proposals and ensures unified, optimised planning. A Technical Support Unit (TSU) of domain experts assists the Logistics Division. The Logistics Division acts as the PM GatiShakti Secretariat. The TSU helps in evaluating these proposals. This layered structure means no single ministry plans in isolation. Every major project is checked against the bigger map before it is sanctioned.

The National Master Plan (NMP) now covers 58 Central Ministries and Departments and all 36 States and Union Territories. …

Sign up free to read the full noteIncludes the rest of The Topic Explained and Current Context

Practice MCQs

Economymedium

Consider the following statements about the PM GatiShakti National Master Plan:

1.It was launched in 2021 as a GIS-based platform for integrated infrastructure planning.

2.It identifies seven Infrastructure Engines including roads, railways and logistics infrastructure.

3.The Empowered Group of Secretaries under it is chaired by the Prime Minister.

Which of the statements given above is/are correct?

A1 and 2 only
B2 and 3 only
C1 and 3 only
D1, 2 and 3
Sign up to check your answer & see the explanation
Economymedium

Match List-I (Institutional body under PM GatiShakti) with List-II (its function) and select the correct answer using the codes below:

List-I

A.Empowered Group of Secretaries

B.Network Planning Group

C.Technical Support Unit

List-II

1.Assists the Logistics Division in evaluation

2.Examines proposals for unified, optimised planning

3.Oversees implementation and approves Master Plan changes

AA-3, B-2, C-1
BA-1, B-2, C-3
CA-2, B-3, C-1
DA-3, B-1, C-2
Sign up to check your answer & see the explanation
Economyeasy

The PM GatiShakti National Master Plan's institutional framework is headed, for oversight and approval purposes, by which functionary?

APrime Minister
BCabinet Secretary
CNITI Aayog CEO
DFinance Secretary
Sign up to check your answer & see the explanation
Economyeasy

Gati Shakti Vishwavidyalaya (GSV), established as a dedicated university for transport and logistics, supports which policy besides the PM GatiShakti National Master Plan?

ANational Logistics Policy
BNational Education Policy
CNational Monetisation Pipeline
DNational Infrastructure Pipeline
Sign up to check your answer & see the explanation
Economyeasy

The 'Go/No-Go area' identification feature within the PM GatiShakti digital platform primarily helps planners to:

ADetermine stock market investment zones
BIdentify zones where development may be ecologically or legally restricted
CClassify states by GDP growth rate
DAllocate central tax devolution shares
Sign up to check your answer & see the explanation

Want the full note, Prelims Facts & MCQ answers?

Create a free account — takes less than a minute.

Create free account