"Siang Dam Project Raises River-Security and Land Rights Concerns"
Antecedent drainage
a river that existed before its mountains rose and cuts through as they rise
Upper/lower riparian state
countries sharing a river, classified by whether they are upstream or downstream of it
Himalayan rivers often cut through young, rising mountains. Antecedent drainage is a river that existed before its mountains, cutting through as they rose. This is how deep gorges form in young fold mountains. The Brahmaputra shows this well. It rises in Tibet, where it is called the Tsangpo, and flows east for a long stretch. Near the eastern edge of the Himalayas it turns sharply and cuts through very high peaks. This forms one of the deepest gorges in the world. The river then enters India through Arunachal Pradesh, where it is called the Siang, before becoming the Brahmaputra in Assam.
A river that flows through more than one country creates a special problem. The country where the river rises and flows first is the upper riparian state. The country downstream is the lower riparian state. India is a lower riparian state on the Brahmaputra; China is the upper riparian state. The river's source and upper course lie in Tibet. India has a National Water Policy. This is a government statement of rules on how river water should be managed. This policy treats river water as a resource shared by the whole river basin. It is held in public trust, not owned by one user. But India and China have no formal treaty on sharing the Brahmaputra's waters. So India has limited power to demand data or cooperation from Beijing.
The Brahmaputra is not the only major river crossing Arunachal Pradesh. The Lohit and the Subansiri are both tributaries of the Brahmaputra. They also flow through the State. The Barak later joins the Meghna system. It flows mainly through Assam, Manipur and Mizoram, not Arunachal Pradesh. The Subansiri Upper Hydroelectric Project is built on the Subansiri river. It has already faced years of local protest over flood risk and poor safety review. This zone is prone to earthquakes. This gives a direct precedent for the resistance now facing the new Siang project.
Building a dam needs land. In Arunachal Pradesh much of that land belongs to Scheduled Tribes. A Scheduled Tribe is a community officially recognised by the Constitution. It needs special protection because of its distinct culture and history. The Adi community is one such Scheduled Tribe living along the Siang river. Communities like the Adi often follow customary land rights. Land is held and passed on by tribal custom and community decision. This is not the same as individual paper title like in most of India. Because of this, special rules unique to the North-East protect tribal land. These rules are on top of ordinary land and environment laws. When the government wants to survey or acquire such land for a big project, these protections must be followed. Sometimes, when local people resist a project, the government deploys security forces. These forces protect survey teams. The government may also use special security laws. These laws give police extra powers to detain or charge people seen as a threat to public order. Deploying security forces for land survey and invoking special security laws against activists deepens local mistrust rather than resolving it.
Hydropower projects are measured by how much electricity they can generate. The unit used is a gigawatt, or GW. One GW equals one billion watts of power. A dam's output often comes from several linked power stations built one after another along a river's fall in height. This design is called cascading power stations. Some dam systems are described as having a cascading effect. The eastern Himalayas, where the Siang and Tsangpo flow, lie in a tectonically active zone. The earth's crust here shifts and causes frequent earthquakes. This matters for dam safety. A sudden release of water, combined with the usual shaking of the ground, can be dangerous. The usual shaking of the ground is called seismic activity. Dams can also disturb a river's natural sediment flow. This process is called sedimentation. It can clog reservoirs and worsen floods instead of preventing them.
With this background on the Brahmaputra, its tributaries, and the risks of dam-building in this zone, the government has proposed a new project. The Siang Upper Multipurpose Project (SUMP) is planned with a capacity of about 11.2 GW. Officials present it as a strategic answer to China's much larger hydropower plans upstream. China's mega-dam on the Yarlung Tsangpo has a planned capacity of about 60 GW. It is designed with five cascading power stations over the river's nearly 2,000-metre fall across just 50 km. Indian planners worry this gives Beijing the power to hold back water to cause drought. Or it could release water suddenly to cause floods downstream. This fear is often called the 'weaponisation' of river flow. It means using control over water as a tool of pressure.
The risk is sharper because the eastern Himalayas are among the most tectonically active and erosion-prone landscapes in the world. …
Consider the following rivers:
1.Barak
2.Lohit
3.Subansiri
Which of the above flows/flow through Arunachal Pradesh?
Consider the following pairs of rivers and the fact that each flows through Arunachal Pradesh:
1.Lohit
2.Subansiri
3.Barak
How many of the above pairs are correctly matched?
Which of the following statements regarding riparian states on a transboundary river is/are correct?
1.The upper riparian state is located downstream of the lower riparian state.
2.India is a lower riparian state in relation to China on the Brahmaputra river system.
Select the correct answer using the code below:
Which of the following is/are features of India's National Water Policy?
1.It treats river water as a shared national resource held in public trust.
2.It mandates compulsory inter-basin transfer of water across all river basins.
3.It prioritises drinking water above irrigation and hydropower in water allocation.
How many of the above are correct?
With reference to China's planned mega-dam on the Yarlung Tsangpo in Tibet, which of the following statements is correct?
Want the full note, Prelims Facts & MCQ answers?