"Cabinet Approves Rs.14,500 Crore Fund for Grid-Scale Energy Storage"
Viability Gap Funding (VGF)
a one-time government grant that helps make an infrastructure project financially viable for private investors
Battery Energy Storage System (BESS)
large batteries that store electricity and release it when the grid needs it
An electricity grid is the network that carries power from power plants to our homes. The amount of power going in must match the amount people use. This balance must stay steady at all times.
India is adding more solar and wind power every year. But solar power stops at night. Wind power changes with the weather. This makes the electricity grid unstable. So the grid needs a way to store extra power. It must release this power later. This is called grid-scale energy storage. It works like a big battery for the whole power system.
We measure large amounts of stored power in GWh, or gigawatt hour. A higher GWh number means more power can be stored and used later.
There are two main ways to store grid power. Battery Energy Storage Systems (BESS) store power in large batteries. They are like a giant version of a phone battery. Hydro Pumped Storage Plants (PSP) pump water uphill when power is cheap. Then they let water flow down through turbines. This makes power when it is needed. Both smooth out the gap between when renewable power is made and when people actually need it.
Many storage projects help the grid a lot. But they do not earn enough money on their own. So private companies do not want to invest in them. The government uses Viability Gap Funding (VGF): a one-time grant that covers part of a project's cost so private companies can still earn a fair return. This tool has been used for roads, ports and other infrastructure since 2006. It is now applied to energy storage too.
India's power planning body is called the Central Electricity Authority. It studies how much power India will need. It plans ahead for it. This body has estimated that the country will need about 411 GWh of grid-scale storage by 2031-32. This is to safely absorb more renewable power. The government already ran two earlier rounds of VGF support for battery storage. These covered about 43 GWh. The new scheme builds on this. It scales it up sharply.
The government also runs a production-linked incentive (PLI) scheme. Under this scheme, companies get a cash reward for making goods. For example, they make battery cells inside India. They do not import them. This pushes companies to build factories in India.
India has also made two long-term climate promises. One is to reach 500 GW of non-fossil fuel capacity by 2030. This means 500 GW of India's power should come from sources other than coal and oil. Solar, wind and hydro are examples. The other promise is net-zero emissions by 2070. This means that by 2070, India will add no more extra harmful gases to the air than it removes. Storage systems help India move closer to both these goals. They let solar and wind power be used more fully.
The highest decision-making body of the central government is called the Union Cabinet. It is a group of top ministers. They approve major government schemes before they start.
Building on this need for storage, the Union Cabinet has approved a Viability Gap Funding Scheme worth ₹14,500 crore. It will run from FY 2026-27 to FY 2030-31. Here, FY means fiscal year. This is the government's financial year used for budgets. The scheme aims to support new storage capacity of 92 GWh. This is 170% of India's current grid-scale storage capacity. The total project investment behind this capacity is estimated at ₹97,600 crore. The VGF grant fills the gap between this cost and what the projects can actually earn from the market.
The capacity is split across three technologies: 60 GWh of Hydro Pumped Storage Plant (PSP) capacity, 30 GWh of Battery Energy Storage System (BESS) capacity, and 2 GWh through alternative storage technologies. …
Consider the following statements regarding the Viability Gap Funding (VGF) Scheme for Grid-Scale Energy Storage Systems approved by the Union Cabinet:
1.The scheme has a total financial outlay of ₹14,500 crore for the period FY 2026-27 to FY 2030-31.
2.The scheme aims to support the development of 92 GWh of new, yet-to-be-commissioned energy storage capacity.
Which of the statements given above is/are correct?
What is the minimum Domestic Content Requirement (DCR) prescribed for Battery Energy Storage System (BESS) projects under the Grid-Scale Energy Storage VGF Scheme?
Match List-I (Storage Technology under the Grid-Scale Energy Storage VGF Scheme) with List-II (Targeted Capacity) and select the correct answer using the codes given below:
List-I
A.Hydro Pumped Storage Plant (PSP)
B.Battery Energy Storage System (BESS)
C.Alternative Storage Technologies
List-II
1.2 GWh
2.30 GWh
3.60 GWh
As per the Central Electricity Authority's estimate, India's grid-scale energy storage requirement is projected to reach approximately how much by 2031-32?
With reference to Viability Gap Funding (VGF) in India, consider the following statements:
1.VGF is a recurring annual grant given to private companies for the entire life of an infrastructure project.
2.For economic sector infrastructure projects, VGF can cover up to 40% of capital expenditure.
Which of the statements given above is/are correct?
Want the full note, Prelims Facts & MCQ answers?
Create a free account — takes less than a minute.
Create free account