"India's Wind Capacity Crosses 59 GW, Eyes Offshore Push"
Viability Gap Funding (VGF)
a one-time capital subsidy that makes a costly but useful infrastructure project financially viable
Contracts for Difference (CfD)
a mechanism fixing the price a generator receives, reducing price volatility and ensuring revenue certainty
Coal, oil and natural gas are called fossil fuels because they took millions of years to form underground. Burning them releases carbon dioxide, a gas that traps heat in the atmosphere and warms the planet. This warming is the basic cause of climate change. Renewable or non-conventional sources, such as sunlight, wind and flowing water, do not get used up and release little or no such emission, which is why countries are shifting toward them. Among these, wind energy converts the kinetic energy of moving air into electricity by turning the blades of a turbine connected to a generator. This works somewhat like how a hand-held fan works in reverse: air pushes the blades instead of blades pushing air. Wind has been harnessed since ancient sailing ships and windmills. But today's turbines use far more efficient technology to generate power at a large scale, measured in gigawatts, or GW, where one gigawatt equals a thousand megawatts of installed capacity.
India's economy is growing, and with it the demand for electricity from homes, factories and vehicles rises every year. Meeting this rising demand by burning more coal would increase greenhouse gas emissions. Since India imports a large part of the coal and oil it uses, relying more on fossil fuels would also increase its dependence on foreign supplies and make it vulnerable to global price swings. To address both concerns, countries worldwide signed the Paris Agreement, an international treaty under which each country submits a Nationally Determined Contribution (NDC), a self-declared plan stating how much it will cut emissions and by when. As part of its NDC, India later announced the 'Panchamrit' commitments, a set of five climate goals. These include raising non-fossil fuel electricity capacity to 500 gigawatts by 2030 and meeting half of the country's energy needs from renewable sources by the same year. Wind power, alongside solar, is central to reaching these goals because India has a large and well-mapped wind resource. This resource is concentrated mainly along its western and southern states, where strong and steady winds occur due to coastal and plateau geography.
Turning this potential into actual power plants needs financial support. Wind projects cost more to set up than conventional coal plants because they need specialised turbines. Where built offshore in the sea, they also need undersea cabling, marine foundations and ships for installation and maintenance, all of which are technologically demanding and expensive. Governments use subsidies and dedicated schemes to close this cost gap. Two such mechanisms matter here. The Viability Gap Funding (VGF) scheme provides a one-time capital subsidy, a lump-sum grant given upfront, to make an otherwise costly but useful project financially viable for private developers. Contracts for Difference (CfD) is a mechanism that reduces price volatility and guarantees revenue certainty to developers. It fixes the price a generator receives for its power regardless of how market prices move. So a developer is protected if electricity prices fall after the project is built. Alongside these, a Renewable Purchase Obligation (RPO) requires power distribution utilities, the companies that supply electricity to homes and businesses, to buy a minimum share of their electricity from renewable sources. This creates guaranteed demand for renewable power. These are the tools now being used to scale up India's wind energy sector.
Before any of these schemes could be designed, India first needed to know how much wind power the country could realistically generate. This mapping was done by the National Institute of Wind Energy (NIWE), a government body that has installed more than 900 wind-monitoring stations across the country. It prepared potential maps at several hub heights, meaning the height above ground at which wind speed is measured. Wind blows faster and more steadily higher up, similar to how a flag flutters more strongly at the top of a tall pole than near the ground. Based on this mapping, India's gross wind potential is assessed at 695.5 GW at 120 metres and 1,163.9 GW at 150 metres above ground level. This is far higher than the capacity installed so far. Eight states hold most of this potential, led by Rajasthan, Gujarat, Maharashtra and Karnataka, followed by Andhra Pradesh, Tamil Nadu, Madhya Pradesh and Telangana. These states have open plains, coastlines or elevated terrain that allow winds to blow with fewer obstructions. This resource base is the foundation for India's stated targets of 100 GW of wind capacity by 2030 and 156 GW by 2036.
Building on this mapped potential and the support schemes described above, installed wind capacity grew from 21 GW in 2014 to 59.20 GW, nearly a 2.8-fold rise. …
Consider the following pairs of renewable energy mechanisms and their purposes:
Mechanism : Purpose
1.Viability Gap Funding (VGF) : Capital subsidy to make a high-cost project financially viable
2.Contracts for Difference (CfD) : Reduces price volatility and ensures revenue certainty
3.Renewable Purchase Obligation (RPO) : Mandates a minimum share of renewable power procurement by utilities
4.Approved List of Models and Manufacturers (ALMM) : Ensures quality and traceability of equipment suppliers
How many of the above pairs are correctly matched?
With reference to India's wind energy targets, consider the following statements:
1.India aims to achieve 100 GW of installed wind capacity by 2030.
2.India aims to achieve 156 GW of installed wind capacity by 2036.
Which of the statements given above is/are correct?
With reference to India's wind power resource assessment, consider the following statements:
1.Gross wind power potential is estimated at about 695.5 GW at 120 metre hub height.
2.The potential increases to over 1,163 GW when assessed at 150 metre hub height.
3.The National Institute of Wind Energy has installed more than 900 wind-monitoring stations across the country.
How many of the above statements are correct?
Consider the following states and their approximate assessed gross wind power potential at 150 metre hub height. Match List-I with List-II and select the correct answer using the codes given below.
List-I (State)
A.Rajasthan
B.Gujarat
C.Maharashtra
D.Karnataka
List-II (Approx. Potential)
1.173.9 GW
2.169.3 GW
3.284.2 GW
4.180.8 GW
The Viability Gap Funding (VGF) approved for a pilot offshore wind project pertains to sites located off the coasts of which of the following states?
Want the full note, Prelims Facts & MCQ answers?