"States Rush to Spot Power Market as Coal Stocks Fall"
Baseload power
power generated continuously regardless of weather, mainly from coal/thermal plants
Power exchange
a marketplace where electricity is traded for short-term delivery, often a day ahead
Most electricity demand has a floor that never goes away: factories, hospitals and homes need power through the night and during cloudy or windless hours. This constant, round-the-clock demand is met by baseload power, which is power that can be generated continuously regardless of weather, unlike solar or wind. Coal-based thermal plants are India's main source of baseload power because they only need a steady fuel and water supply, not a specific river site or sunlight. So they can run at any hour.
To understand why coal supply itself is uncertain today, it helps to know how India's coal sector came to be organised. The coal sector in India was nationalised under Indira Gandhi's tenure, meaning the government took over privately run coal mines and placed them under state control. So that coal production and pricing would serve national needs rather than private profit alone. For decades after that, blocks of coal meant for a company's own captive use, meaning coal set aside for a specific power or steel plant to consume itself rather than to sell, were handed out through a discretionary administrative process rather than open bidding. Officials selected companies on their own judgement, without a transparent, competitive procedure. This left room for favouritism. The Supreme Court later found this process unfair and cancelled 204 of 218 coal blocks allotted between 1993 and 2012 for being arbitrary, because they had been given out without fair, objective criteria. Parliament responded with the Coal Mines (Special Provisions) Act, 2015, which made competitive auction the sole legal method of allocating coal blocks, not any lottery system. So that blocks are now won by companies bidding against each other rather than by official discretion. Even today, not all coal-based power plants are government-run: private companies also own and operate thermal power plants in India, alongside public sector ones.
Monitoring this entire captive coal block system, and resolving disputes around it, is the job of the Coal Controller's Organisation (CCO), a government body that tracks progress on captive coal and lignite block development, hears objections whenever the government formally notifies land for coal-bearing area acquisition, and serves as the major official source of coal statistics in India.
Even with India's large coal reserves, built up over the Gondwana coal fields that run through central and eastern India, the country still imports coal. This happens for two separate reasons: many power plants cannot get enough domestic coal to run at full capacity, and steel plants need coking coal of a particular quality that is mostly found abroad. This is not because of any policy choice to save domestic reserves for later.
Beyond the fuel itself, how power is traded matters too. When power is traded for a day or a few hours ahead rather than through a long-term contract, this happens on a power exchange, a marketplace where distribution utilities buy and sell electricity for short periods, often just a day ahead. To prevent runaway prices on these exchanges, the government imposes a price ceiling, which is the highest legal price a seller can charge, set below what buyers might otherwise pay in a real shortage. Normally this cap is Rs 10 per unit on the day-ahead market. There is a special High Price Day-Ahead Market (HP-DAM) allowing up to Rs 20 per unit when supply is very tight. When demand for electricity outruns what generators can supply at the capped price, a shortage follows. This is exactly why some states have instead gone outside the exchange altogether, floating tenders on the Ministry of Power's DEEP (Discovery of Efficient Electricity Price) portal, where prices have touched Rs 19-20 per unit without any cap.
The supply of thermal capacity itself was deliberately slowed a decade ago. The Union Power Ministry's National Electricity Plan for 2017-22 ruled out fresh thermal capacity additions beyond 2022, apart from about 50 GW (gigawatts, a unit measuring large amounts of power capacity) of projects already under construction, choosing instead to scale up renewables and discouraging imported-coal projects when global coal prices were spiking. The stated aim behind this choice was to cut reliance on imported fuel and to reduce emissions by shifting new capacity towards solar and wind, which had also become cheaper to build. However, this meant far less new coal-based capacity was added than the country's round-the-clock demand would eventually require. Solar and wind cannot supply power when the sun is not shining or the wind is not blowing. This planning decision is what set the stage for today's baseload shortfall, discussed next.
Because of this shortfall in planned thermal capacity, even the coal that is available has become harder to stock and manage. Thermal plants are required to hold a buffer of coal, called a normative coal stock, so that a brief supply disruption does not stop generation. This normative requirement is around 59 million tonnes (mt), and plants currently have storage capacity for up to 80 mt, about 30 days of consumption. The government is now discussing doubling this to 160 mt, giving 60 days of cover. Though this needs new storage space at plant sites. Despite this buffer, coal stocks fell sharply this year: inventories at domestic coal-based plants dropped by around 66% between April and September, compared with a much smaller 23% fall in the same months last year. Stocks fell from about 55 mt in April to under 21 mt by mid-November. This sharper fall reflects demand for electricity rising faster than coal supply and dispatch could keep pace with. Plants ran down their buffers instead of maintaining them.
This shrinking buffer shows up directly on the grid. Grid India, the body responsible for operating India's power grid in real time, requires grid frequency, which is the rate at which alternating current oscillates and must be kept stable for the grid to function safely. …
Consider the following statements:
1.Coal sector was nationalized by the Government of India under Indira Gandhi's tenure.
2.Currently, coal blocks are allocated on lottery basis.
3.India, till recent times, imported coal to meet the shortages of domestic supply, but now India is self-sufficient in coal production.
Which of the statements given above is/are correct?
Despite having large reserves of coal, why does India import millions of tonnes of coal?
1.It is the policy of India to save its own coal reserves for future, and import it from other countries for the present use.
2.Most of the power plants in India are coal-based and they are not able to get sufficient supplies of coal from within the country.
3.Steel companies need large quantity of coking coal which has to be imported.
Which of the statements given above is/are correct?
Consider the following statements regarding India's short-term power procurement:
1.The price cap on spot power market transactions is Rs 10 per unit.
2.The High Price Day-Ahead Market (HP-DAM) allows prices up to Rs 20 per unit.
3.Tenders floated through the DEEP portal are bound by the same price cap as the power exchanges.
How many of the above statements are correct?
With reference to coal block allocation in India, consider the following statements:
1.Coal blocks are currently allocated through competitive auction.
2.The Coal Mines (Special Provisions) Act, 2015 was enacted following a Supreme Court order cancelling a large number of earlier coal block allotments.
Which of the statements given above is/are correct?
The National Electricity Plan (2017-22) is associated with which of the following policy decisions?
Which of the following statements about thermal power plant coal stock norms in India is correct?
Grid India's mandated frequency band for grid stability has a lower limit of:
Want the full note, Prelims Facts & MCQ answers?