S&TGS3

ISRO completes key crew module safety tests for Gaganyaan mission

The Hindu·2026-07-13· Read original

"ISRO completes key crew module safety tests for Gaganyaan mission"

Prelims Facts

  • •Gaganyaan targets Low Earth Orbit (LEO) at approximately 400 km altitude with a crew of 3 for up to 7 days
  • •Launch vehicle: LVM3 (Launch Vehicle Mark-3), formerly GSLV Mk-III, India's heaviest operational rocket
+4 more facts — sign up free to unlock

Key Terms

Crew Module (CM)

pressurised capsule housing astronauts during launch, orbit, and re-entry

Service Module (SM)

unpressurised module providing propulsion and power during orbital phase

+4 more terms — sign up free to unlock

Study Note

BackgroundCore Concept

Background

India's human spaceflight ambitions crystallised formally when the Gaganyaan programme was announced in 2018, with a stated objective of sending a three-member Indian crew to low Earth orbit (LEO) for a mission duration of up to seven days and returning them safely to Earth. The programme is managed by ISRO under the Department of Space and represents the most complex and safety-critical mission the organisation has undertaken. The constitutional and policy basis for India's space activities rests with the Indian Space Policy 2023, which delineates roles between ISRO (research and national missions), IN-SPACe (regulatory body for private players), and NewSpace India Limited (NSIL) (commercial arm).

Gaganyaan is designed to use the LVM3 (Launch Vehicle Mark-3) rocket — previously called GSLV Mk-III — as its launch vehicle, chosen for its proven heavy-lift capability. The programme involves developing an entirely indigenous crew module (CM) and service module (SM), life support systems, crew escape systems, and recovery mechanisms. Prior to a crewed mission, ISRO has planned uncrewed test flights (G1 and G2) and a flight with a humanoid robot called Vyommitra to validate all systems. The programme has strategic significance beyond science: it positions India among the select group of nations — the USA, Russia, and China — capable of independent human spaceflight.

The Topic Explained

The crew module (CM) is the pressurised capsule that houses the astronauts (called Gaganauts in Indian parlance) during launch, orbital phase, and re-entry. It must withstand extreme thermal, mechanical, and aerodynamic stresses. The service module (SM) is an unpressurised module attached below the CM that provides propulsion, power, and other support functions during the orbital phase. The two are connected through an umbilical mechanism that transfers electrical power, data, and fluids; this must be cleanly severed at precise moments during re-entry.

Three subsystems tested in the current round are critical to crew survival. First, the Crew Module Uprighting System (CMUS) ensures the capsule floats upright after splashdown in the Bay of Bengal, preventing capsizing that could trap astronauts. It uses stored cold gas to inflate flotation bags. Second, the umbilical separation mechanism has two components — CSU-1 (crew module side) and CSU-2 (service module side). …

Sign up free to read the full noteIncludes the rest of The Topic Explained and Current Context

Related PYQs

2020GS3 Mains

What is the significance of the Indian Space Research Organisation's (ISRO) recent achievements in space technology? Discuss the challenges and opportunities for India in the domain of space exploration.

Sign up free to see the model answer

Practice MCQs

S&Tmedium

With reference to the Gaganyaan human spaceflight programme, consider the following statements:

1.The launch vehicle designated for Gaganyaan is the PSLV-XL variant.

2.The Crew Escape System (CES) was successfully tested in the TV-D1 mission in 2023.

3.Post-splashdown recovery of the crew module is planned in the Arabian Sea.

Which of the statements given above is/are correct?

A1 and 2 only
B2 only
C1 and 3 only
D2 and 3 only
Sign up to check your answer & see the explanation
S&Teasy

The 'Crew Module Uprighting System (CMUS)' in the context of the Gaganyaan mission is primarily designed to:

AStabilise the crew module during the high-altitude ascent phase to prevent roll oscillations
BEnsure the crew module maintains an upright floating position after splashdown in the sea
CCorrect the orientation of the crew module during orbital insertion manoeuvres
DProvide structural rigidity to the crew module during peak aerodynamic heating on re-entry
Sign up to check your answer & see the explanation
S&Thard

With reference to the umbilical separation mechanism of the Gaganyaan crew module, which of the following correctly describes the sequence of events during re-entry?

ACSU-2 separates first to detach the service module, followed by CSU-1 separation just before atmospheric re-entry
BCSU-1 and CSU-2 separate simultaneously at the moment of de-orbit burn initiation
CCSU-1 disconnects first allowing service module separation, then CSU-2 separates just before atmospheric re-entry
DThe entire umbilical mechanism separates as a single unit after parachute deployment
Sign up to check your answer & see the explanation
S&Tmedium

Assertion (A): The apex cover of the Gaganyaan crew module is separated before parachutes are deployed during re-entry.

Reason (R): The apex cover protects the parachute assembly during the mission and must be jettisoned to allow parachutes to deploy and decelerate the crew module.

Select the correct answer:

ABoth A and R are true, and R is the correct explanation of A
BBoth A and R are true, but R is NOT the correct explanation of A
CA is true but R is false
DA is false but R is true
Sign up to check your answer & see the explanation

Want the full note, Prelims Facts & MCQ answers?

Create a free account — takes less than a minute.

Create free account